Mumbai, 21st April 2025:
Committed to safety and operational excellence, Chhatrapati Shivaji Maharaj International Airport (CSMIA) has scheduled its annual pre-monsoon runway maintenance for 8 May 2025, between 1100 hrs and 1700 hrs. During this time, both the primary runway 09/27 and secondary runway 14/32 will be temporarily non-operational. As part of CSMIA’ s comprehensive monsoon contingency plan, a Notice to Airmen (NOTAM) was issued six months in advance to notify airlines and stakeholders, enabling airlines to adjust their flight schedules well ahead of time. enabling them to plan appropriately.
This annual pre-monsoon maintenance is crucial for preserving the health and longevity of CSMIA’s expansive airside infrastructure, covering 1,033 acres. Specialists will inspect runway surfaces for wear and tear, addressing preventive measures for waterlogging to ensure safe landings and take-offs during the monsoon season. CSMIA also leverages advanced technology to monitor the entire maintenance process, ensuring timely execution within the designated six-hour window.
CSMIA has meticulously coordinated this maintenance with multiple stakeholders, including airlines and aviation authorities, to enable a seamless experience for passengers. This proactive approach reflects CSMIA’s commitment to safety, efficiency, and reliability in its operations. By prioritising infrastructure upkeep, CSMIA aims to ensure a smooth experience for both airlines and passengers, while maintaining the highest standards of safety and service excellence.